Plan from the equipment record
A maintenance plan should reflect the exact robot and controller model, operating environment and manufacturer documentation. Collect existing inspection logs, service history, operating hours where available, and records of abnormal noise, wear or intermittent alarms. Generic online guidance is not a substitute for the model-specific maintenance schedule or qualified site assessment.
Use a structured shutdown checklist
Record the planned work, required parts, responsible personnel and verification steps before the shutdown. Preserve relevant equipment information according to the site procedure. Lubrication products, quantities, intervals and replacement methods must follow the applicable manual; do not apply a generic specification across different robot models. Any safety-related inspection should stay within the responsible qualified personnel’s scope.
Connect findings with the next action
Keep inspection results linked to the component and date so that later changes can be reviewed. If a finding calls for repair or replacement, prepare the part number, photographs, symptoms and equipment version before contacting the team. The articles below provide reading paths; the inquiry and parts tools help organize what the team needs to assess your equipment.



